USTAY Construction
Azerbaijan, www.ustay.com/
Construction, Real Estate, Architecture... Show more
Planning Engineer
Work Experience:
SOCAR POLYMER (CLIENT)
Kinetics Technology (EPC)
Azerbaijan, Sumgayit
http://ustay.com/
 
USTAY Construction 					from: 26 December 2016 up to 30 September 2017	
                                                                               Reason for leaving job:  Due to all most project finished
Position:  Project Planning Engineer
Project  involved: 
•	SOCAR PP-U&O and HDPE Projects 
Polypropylene and High-Density Polyethylene Plant Project.
o	Polymerization Area
	Polymerization Building.
	Polymerization Piperack.
	Raw Material Handling.
	Low-Pressure Solvent Recovery.
	Steam Condensate.
	Ethylene Treatment.
	Cooling Water Supply Return.
	Solvent Branch Piperack.
	Solvent Recovery Piperack
	Ethylene Compressor
	Flair Drum
	Reactor Dump Tank
	Powder Conveying Package
	Nitrogen Purification Package
o	Interconnection Piperack Between Extrusion & Polymerization Piperacks.
o	Extrusion Area
	Extrusion Building.
	Extrusion Piperack.
	Additive Storage.
	Tower Crane.
	Polymer Water Pit.
o	Organoleptic Area
	Organoleptic Building.
	Organoleptic Treatment
o	Blending Silo are
	Blending Silo Building.
	Pellet Conveying Package.
	Blending Silo Piperack.
o	Bagging & Packing Silo Area
	Bagging & Packing Building.
	Bagging Silo Piperack.
o	Fire Water Valve House Area
	Fire Water Valve House Building.
	Fire Water Valve House Piperack.
	UG Lines
o	Substation Area
	Substation Building.
	Control Room
	Rack Room
	Transformer
	Substation Piperack
o	Catalyst Unloading Building
o	Catalyst Activator Building
o	Cooling Tower
Job Description:
	Management / Construction plans at all levels
	Plan, Report and control work schedule.
	Weekly reporting of the work progress in accordance to the plan package i.e Plan against actual and its variances
	Early warning of foreseeing area of concern to Project manager of any issue causing delay to the project
	Critical path program analysis 
	Weekly, Monthly and periodic 90 days Plan of Construction
	Checking Daily Man Power and preparation of the daily report
	Make a plan in P6 at all levels also in MS Project
	Hard working under pressure with a Planning team
	Checking Construction Progress on a site
	Updating schedule P6
	Daily, weekly Photo Progress
	Milestones Plan
	Project Summary Schedules
	Project Detailed Schedule
	Baseline Schedule
	Progress S-Curves
	Updating Layouts 
	90 Day Plan
	Making Progress Payment
	Quantity Surveying.
	Steel Structure progress and making databases.
	Pipe Racks progress calculations.
	Piping prefabrication and erection works (shop weld, field weld, tack weld etc.) progress calculations.
	Spooling works calculations from isometrics.
	Making concrete a  for actual and for drawing quantities and keeping under control for different of both.
	Preparing equipment’s transporting and installation schedule for purchase.
	Preparing schedule for electrical, earthing and finishing works and given progress. 
	Making micro-schedule for critical works.
	Calculating Underground works progress by quantities from drawings and given progress.
	Making schedule and progress for Piping prefabrication, fabrication, site assembly and site erection work. Also for support fabrication and erection works.
	Weekly & Monthly Achieved and Against  progress calculation & Preparing 28 days to look ahead schedule for below works
•	Civil Works
	Piling, Excavation, Foundation, Backfilling, Cast In Situ R.C. Structure, Building – Masonry, Paving – Concrete, Building – Finishing, Grouting - Steel Structures, Steel Sheets (Roofs / Sidings), Fire Proofing Steel Structure, Clean Agent System Installation, HVAC installation, UG Sys. - Pit/Trench/Pipe/Cable (UG), UG Sys. -Storm Water Drain(UG), UG Sys. - RC/HDPE/PVC/PP Lines (UG), UG Sys. - Earthing System - Strip Laying (UG) Works.
•	Steel Structure Works.
	Steel Structure Assembly & Erection, Sec. Steel/Handrails/Ladders/Gratings Works.
•	Piping Works.
	Piping - Sandblasting. & Primer, On Site Erection Piping >=2, On Site Support Erection, On Site Erection Piping <2, On Site Support Fabrication, Tie-Ins Works.
•	Mechanical Works.
	Package Units, Heat Exchangers, ROTARY COMPRESSORS, VESSELS / SILOS, AUXILIARY STEEL STRUCTURE, Other Static Equipment’s, Loop Reactors, Extruder, Package Units-Pneumatic Conveying System - Equipment, Package Units - Pneumatic Conveying System - Pneumatic Haulage Piping, Static - Columns, Other Machinery Works.
•	Electrical Works.
	Field Panels/Local Stations, Heating System, Lighting Systems, Substation Equipment (Common-60, HDPE-106nos.), Cathodic Protection Electrical work(UG), Distribution Transformer
•	Instrumentation Works.
	Branch Cable Tray, Cabinets/J.B/L/P/ Shelters, Main Cable Laying, Main Cable - Terminations, Branch Cable Laying & Termination, Instruments - Installation, Instruments - Calibration, Connections
•	Painting & Insulation Works.
	Piping Painting Finishing Coats, Steel Structure & Piping Supports-Finishing Coats, Equipment Painting Finishing Coats, Insulation - Piping, Insulation – Equipment
•	Pre-commissioning
	Pre-commissioning Activities