“PHLAGMAN ”LLC
Aksay (Kazakhstan), Phlagman.com
Construction, Real Estate, Architecture... Show more
QA/QC Manager
December 15, 2006 till the March 25, 2009
“PHLAGMAN ”LLC
Position: QC Manager
-Management of QA/QC department
-Implementation and supervision of the work of the company in accordance with ISO 9001-2000 requirements, document control, job description issuing, issuing and revising of Quality Management System procedures, internal audits
Coordinator of EPC contract (Engineering, Project, Construction) Project “TCC Plant”
- Coordination of the following works: earthing and concrete works, installation of steel structures, installation of exhaust and supply ventilation, installation of process and fire water pipeline, electrical and instruments installation, putting facility into operation
-Control for construction of LLC “Phlagman” and contractor in accordance with KPO procedures and specifications, ASME, API standard and National RoK standards on: earth works , civil works, concrete works, welding activities and coating works during construction steel structures and pipeline, piping works
-Monitoring of KPO specifications, ASME and API standards and N RoK standards maintaining
- Carrying out of internal audit.
- Define company’s targets in Quality Control
- Take part in Quality Control Company Policy
- Carrying out of Quality Policy requirements
- Issue of developed procedures for quality control, coordination of developed issues, activities coordination;
June 01, 2005 till December 14, 2006
“PHLAGMAN ”LLC
Position : Certification engineer
-Construction activities at Karachaganak Field, Contract AP/Y/1966: production and re-injection wells hook-up, flow lines construction, installation of process pipelines at Unit -3, Unit -3 and KPC during Total Shutdown period, construction of metal structure building at Waste Management Complex;
-Preparation and handing over of as-built documents (ICS, Test Packs, MCP,);
-Preparation of applications for material; preparation of hidden works acts, accepting acts for every construction done, updating of civil, welding, PWHT log-books.
Performance of Welding Inspector’s duties
-Supervision of welding activities in accordance with standards requirements (ASME B31.3, B31.8, API 1104, SNIP RK 3.05.09-2002, VSN 06-009), welding consumables control, ASME reporting documentation.
-Collection and processing of information on welding, PWHT, NDE.
Performance of Material Coordinator’s duties
-Receiving, coordination and issuing materials as per projects, updating of warehouse material database.
-Work with MS Excel database
April 27, 2005 till May 31, 2005
“PHLAGMAN ”LLC
Position: Safety Engineer
-Preparing of Permits-to-Work, Safety Shutdown plans, Method Statements, control equipment and employees for correspondence with Company’s requirements in the sphere of labor protection, developing and issue of revisions for HSE procedure and labor instruction.